It took yesterday evening and this morning to complete all the preparations for laying our wood floor. We had to pull up the carpet, remove tack strips and staples, sand down uneven areas of the sub floor, move furniture around, remove the lower stair railings, remove the closet doors, and sweep and vacuum.
We were hoping to get started nailing down the floor last night, but the preparations weren't finished. I scheduled vacation for today and tomorrow to work on it. The plan was to get me started last night and then I could work on it while Robbie was at work today. Last night I had almost decided to go to work today, since I wouldn't have Robbie to get me started. But the heavens were smiling on us, because it rained during the night and this morning, so Robbie's boss told him they couldn't work today. He got to stay home and get the floor going!! What luck!
The picture below shows the living room ready to go. That roll of paper in front of the door is the underlayment.

Here's Robbie lining up the underlayment and rolling it out.

Robbie rolled it all the way to the back patio door.

Then Robbie measured for the chalk line.

If you look closely, you can see the blue chalk line near the left wall. That gave Robbie a guide to line up the first row of flooring.

This was a happy moment! After all the preparation, here's Robbie putting in the first nail in the first piece of wood! Finally!

And so it goes, on down the line!

After three or four hours, Robbie has seven rows nailed down. And it looks WONDERFUL! It's straight and beautiful. Robbie is a very talented carpenter! I'm so lucky to have him!


It's break time and the cats finally come out of hiding, now that the nailing has stopped and it's quiet. At first they won't walk on the new floor. They jump across it! But they finally get brave enough to tip-toe across it -- of course, Rascal leads the way.
